The pictures above demonstrate Raineri's extensive capability in serving the special needs of our customers. As part of the Highway 64 re-construction project, the Vandeventer /64 exit ramp will consume nearly 7,500 yards of concrete over a 10 month time frame. Contractor: JRW Construction. Owner: Missouri Department of Transportation. For more information contact Raineri Ready-Mix (314) 781-1573.


Featured Infrastructure Projects:
footer line
spacer gif
Project: Sara Street Bridge
Description: One of the many bridges we supplied over the years. When complete, we will have supplied 9,000 yards under two separate contracts.
Owner: Modot
Contractor: Kozeny/Wagner
Pavement under Bridge: Wilson Concrete
Remaining Pavement: JRW Construction
Completion Date: Late 2006
spacer gif


Project: Metro Link Mass Transit Project
Description: Two of four stations were under our contract. This contract required over 12,000 yards of varied concrete strengths.
Contractor: ICR Construction
Sub-Contractor: Vee Jay Cement
spacer gif
Project: Jefferson Avenue Extension
Owner: City of Pacific
Description: Over 1/4 mile pavement placed in five pouring days. At 100 cubic yards per hour, one-half of the pavement was placed in six hours.
Contractor: JRW Construction
spacer gif
spacer gif
footer line
6351 Knox Industrial Drive | St. Louis, MO 63139
(tel) 314.781.1573 | (fax) 314.781.0621 | info@raineri-materials.com

Copyright 1999 - 2003, Raineri Building Materials, Inc.

spacer gif